Westhaven Square

Fairfax County, VA · completed 2023

EngineeringSales / marketing

Plan sets

  • Engineering
    Approved site plan · Phase 1
    Reviewed
    Dated 2021-03-173 sheets
    • C-1
    • C-2
    • C-5
  • Sales / marketing
    Site rendering
    Reviewed
    Dated 2022-01-111 sheet
    • Community plan

Attributes

27 of 41 extracted · 3 unconfirmed · 1 disagreement

AttributeValueSourceFrom
Zoning districtPDH-12StatedEng Sheet C-1
Approval date
Max density permitted12.00 units/acStatedEng Sheet C-1
Density achieved9.20 units/acStatedEng Sheet C-1
Total units48StatedEng Sheet C-1
Unit types48 townhomeStatedEng Sheet C-1
Affordable units (MPDU/ADU)6StatedEng Sheet C-1
Gross acreage5.20 acStatedEng Sheet C-1
Net acreage
LoadingFrontStatedEng Sheet C-2
Number of buildings7StatedEng Sheet C-2
Units per building6.9EstimatedEng Sheet C-2
End unit share
Shortest building120 ftEnteredEng Sheet C-2
Longest building168 ftEnteredEng Sheet C-2
Average building length146 ftUnconfirmedEng Sheet C-2
Typical lot width24 ftStatedEng Sheet C-2
Lot width range
Typical lot depth
Rear yard depth
Front setback
Typical block size310 ftUnconfirmedEng Sheet C-2
Typical street width
Street ownershipPublicStatedEng Sheet C-2
Alley width
Parking ratio2.20 sp/unitStatedEng Sheet C-1
Parking provision
Garage configurationFront-loaded 2-carStatedEng Sheet C-2
Visitor parking spaces11StatedEng Sheet C-1
Open space1.10 acMarketing plan says 1.60 acStatedEng Sheet C-1
Open space share
Amenities
Tree save / forest conservation0.70 acStatedEng Sheet C-1
Floodplain / wetlands / RPA0.40 acStatedEng Sheet C-1
Grade change across site34 ftUnconfirmedEng Sheet C-5
Stormwater managementBioretentionStatedEng Sheet C-5
Mixed useNoStatedEng Sheet C-1
Other uses
HOA scope
PhasingTwo phases; Phase 2 covers the eastern 22 units.StatedEng Sheet C-1
Notable conditionsGrade across the west third exceeds 8%; rear alley determined unworkable.StatedEng Sheet C-5

Where the engineering and marketing sets disagree, the engineering value is shown. Unconfirmed estimates are excluded from the precedent filters until a curator checks them.

Lessons learned

What we would do differently

Front-loaded here because the grade across the site made a rear alley unworkable on the west third. It reads as a compromise from the street and we would fight harder for the alley next time, or step the alley with the grade rather than abandoning it site-wide.